It's been one hectic month in my non-knitting life. Hence it being so long since an update.
I've been on a dishcloth spree. Off the top of my head I can remember making 5 and 2 more in progress. I'm planning on making a bunch more for Christmas gifts. They'll also have Tribbles with them too.
I'm working on the afghan. Dad has decided he doesn't want it 8' long anymore. It's long enough where it is he said! YAY! thing is now i have to even the working edge off and fill in a few holes. THat's ok. I can deal with that. It also frees me up to start on other Christmas gifts. Eventually I'll get back to my sweater. Pics coming by the end of the week of afghan and dishcloths.
Showing posts with label Afghan. Show all posts
Showing posts with label Afghan. Show all posts
Monday, September 10, 2007
Wednesday, August 15, 2007
Tibbles & Dishcloths
I've crossed over to the other side. In other words, I've started making Tribbles. I'll tell you it's so much fun. Watch out though. It's addictive. They multiply so fast too. I'm also on a dishcloth spree too. Good thing they're intended for christmas gifts. The tribbles too. THat is the ones that I don't decide to keep or send to the shop.
While I was making them I realized that they would be really handy down at my landlady's store. She's the one with the paint your own pottery and stained glass studio. In order to keep the pottery molds from pitting and/or getting a fuzz on them between pourings if they aren't going to be used right away, the excess clay has to be cleaned off the mold. I realized that the Tribbles would be good for just this purpose. They'd also be good for getting glaze off the wall (don't ask). I gave her one today and I'm going to have a couple more on back up.
The afghan is 4' from being done. Everything else has gone into a temporary hibernation. I just need a little break from them.
While I was making them I realized that they would be really handy down at my landlady's store. She's the one with the paint your own pottery and stained glass studio. In order to keep the pottery molds from pitting and/or getting a fuzz on them between pourings if they aren't going to be used right away, the excess clay has to be cleaned off the mold. I realized that the Tribbles would be good for just this purpose. They'd also be good for getting glaze off the wall (don't ask). I gave her one today and I'm going to have a couple more on back up.
The afghan is 4' from being done. Everything else has gone into a temporary hibernation. I just need a little break from them.
Saturday, August 04, 2007
Projects
Hmmm....so how are the projects going????
The aran sweater is still hibernating. I really want to work on it, yet the heat has not broken. I can tell this is going to be a winter only project
Dad's afghan is 7 feet by 4 feet as of right now. Where is t goin tobe when it's done? 6 feet by 8 feet. So it's a foot soo wide right now and 4 feet too short. My Dad did say approximatley when I finally pinned him down on a size. So I'd say I'm doing pretty good on it.
Garterlac Dishcloth, I just started today and considering I've never done entrelac before, I'm doing quite well.
Cat's Paw Lace, I'm 8 or so repeats in. Abot 1/2 way.
Mom's Socks. Don't ask.
The aran sweater is still hibernating. I really want to work on it, yet the heat has not broken. I can tell this is going to be a winter only project
Dad's afghan is 7 feet by 4 feet as of right now. Where is t goin tobe when it's done? 6 feet by 8 feet. So it's a foot soo wide right now and 4 feet too short. My Dad did say approximatley when I finally pinned him down on a size. So I'd say I'm doing pretty good on it.
Garterlac Dishcloth, I just started today and considering I've never done entrelac before, I'm doing quite well.
Cat's Paw Lace, I'm 8 or so repeats in. Abot 1/2 way.
Mom's Socks. Don't ask.
Friday, July 20, 2007
Ravelry and project update
I'm so addicted to Ravelry it's not even funny. Ok . . . actually, yes it is. It's become my homepage and I'm photographing my knitting so much more. Nevermind all the things I've got in my queue.
As for my projects: Aran sweater: hibernating.
Afghan: Gatting added to daily
Mom's Socks: Slowly getting worked on *New Project*
Cat's Paw Lace Scarf: 3 repeats in
P.S. I'm KnittingCliona over on Ravelry
As for my projects: Aran sweater: hibernating.
Afghan: Gatting added to daily
Mom's Socks: Slowly getting worked on *New Project*
Cat's Paw Lace Scarf: 3 repeats in
P.S. I'm KnittingCliona over on Ravelry
Sunday, July 08, 2007
ITE 4 project.....done
Afghan..... camping out on living room floor and still getting added to. I'v gotten to the point that I've tired of taking it up all the time so it's staying there on the floor until I have to take it up.
Sweater.... no motivation to work on it. It's too danged hot.
Mom's socks...Missing in action
Also I've gotten on to Ravelry! Yay! I'm so excited. I've been living there practically it seems. Over there I'm KnittingCliona.
Afghan..... camping out on living room floor and still getting added to. I'v gotten to the point that I've tired of taking it up all the time so it's staying there on the floor until I have to take it up.
Sweater.... no motivation to work on it. It's too danged hot.
Mom's socks...Missing in action
Also I've gotten on to Ravelry! Yay! I'm so excited. I've been living there practically it seems. Over there I'm KnittingCliona.
Wednesday, June 27, 2007
Afghan, Socks, Sweater, and whatnot
Dad's afghan is growing. Slowly but surely.
Mom's socks....a new project as of tonight....are going to be her christmas present.
The sweater is on halt as I'm not working on a sweater when it's 90 + degrees out.
MY ITE 4 project is going along smoothly (knock on wood) too.
That's it for knitting projects right now. My sanitys is on a fine line this week with so much going on. That's why I am wondering why the crazy idea to knit an orange scarf of unknown length (but extremely long) has hit and stuck. It's purpose would be to attract people to an informational fair next March (that's how long it would be). See what I mean by my sanity is on a fine line this week.
Mom's socks....a new project as of tonight....are going to be her christmas present.
The sweater is on halt as I'm not working on a sweater when it's 90 + degrees out.
MY ITE 4 project is going along smoothly (knock on wood) too.
That's it for knitting projects right now. My sanitys is on a fine line this week with so much going on. That's why I am wondering why the crazy idea to knit an orange scarf of unknown length (but extremely long) has hit and stuck. It's purpose would be to attract people to an informational fair next March (that's how long it would be). See what I mean by my sanity is on a fine line this week.
Friday, June 08, 2007
Weekly Stashalong Update
Yellow = I'm plugging away on it. (2 projects).
Red = Done (8 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Yet again stalled.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost done, on to the cuffs.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE and sent off
Red = Done (8 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Yet again stalled.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost done, on to the cuffs.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE and sent off
Saturday, June 02, 2007
Let's see...how are things going!
Socks....6-7 more rounds and the gussets are done and on the the heels. Yay. It seems like the gussets have taken forever.
Afghan....plugging away on it. It's my mindless project. Definitley being a glutton for punishment with all the blocks to sew on. By the way it's 6 1/2 feet wide and it will be 8 feet long.
Sweater...we won't go there.
International Tote Exchange ... yarn and pattern picked, will be casting on this week.
International Scarf Exchange... will be going in the mail by friday.
SP 10... final package will be getting mailed by friday also.
Afghan....plugging away on it. It's my mindless project. Definitley being a glutton for punishment with all the blocks to sew on. By the way it's 6 1/2 feet wide and it will be 8 feet long.
Sweater...we won't go there.
International Tote Exchange ... yarn and pattern picked, will be casting on this week.
International Scarf Exchange... will be going in the mail by friday.
SP 10... final package will be getting mailed by friday also.
Wednesday, May 23, 2007
Various Pics Starting w/ SP10
Monday, May 21, 2007
Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Monday, May 14, 2007
Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE>
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
9.) Gifted Mittens -- DONE
Tuesday, May 08, 2007
Stashalong Update
Green = Sitting there feeling neglected (1 Project).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.)A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.)A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.)A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.)Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.)Gifted Mittens -- DONE
10.)ISE 4 scarf (Lopi) -- DONE
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.)
4.)
5.)
6.)
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.)
10.)
Monday, April 30, 2007
Halfway on Counts list. Inventory count Met!!!
Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Friday, April 27, 2007
Stashalong Udate
Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.
The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.
The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.
Thursday, February 15, 2007
Joined Stashalong
I've Joined Stashalong. Right now I'll be doing option 3. That is until I get to sit down and inventory my yarn onto the computer. Then I'll (if it's allowed) add in option 2. My projects are:
An Irish Aran Sweater (using Patons Classic Merino)
Knitty's Chaos note: need to finish it really soon baby is due on 4/15 (using some red heart baby yarn for body and another for the arms)
A scarf and hat set for a raffle on March 1 (yarns unknown)
A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart)
A cotton hooded bath blanket for the baby to be (using lilly sugar and cream)
A second hooded bath blanket for another baby to be (using unknown cotton yarn in stash)
Triangle Shawl for Mom (Yarn not picked yet)
Afghan for Dad (Yarn not picked yet)
"Screaming Stash"
"Screaming Stash"
So that's my project list for Option 3
An Irish Aran Sweater (using Patons Classic Merino)
Knitty's Chaos note: need to finish it really soon baby is due on 4/15 (using some red heart baby yarn for body and another for the arms)
A scarf and hat set for a raffle on March 1 (yarns unknown)
A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart)
A cotton hooded bath blanket for the baby to be (using lilly sugar and cream)
A second hooded bath blanket for another baby to be (using unknown cotton yarn in stash)
Triangle Shawl for Mom (Yarn not picked yet)
Afghan for Dad (Yarn not picked yet)
"Screaming Stash"
"Screaming Stash"
So that's my project list for Option 3
Subscribe to:
Posts (Atom)