Showing posts with label ISE 4. Show all posts
Showing posts with label ISE 4. Show all posts
Wednesday, June 13, 2007
Pals are Happy
Well both my ISE4 and SP10 pals have received their packages and are happy with what I've sent them. Great news to get today. I had a wool crisis on my hands. Still a bit jumpy over it so I'll post about it tomorrow along with a picture. Don't worry though no winged creatures are involved.
Friday, June 08, 2007
Weekly Stashalong Update
Yellow = I'm plugging away on it. (2 projects).
Red = Done (8 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Yet again stalled.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost done, on to the cuffs.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE and sent off
Red = Done (8 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Yet again stalled.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost done, on to the cuffs.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE and sent off
Wednesday, June 06, 2007
Saturday, June 02, 2007
Let's see...how are things going!
Socks....6-7 more rounds and the gussets are done and on the the heels. Yay. It seems like the gussets have taken forever.
Afghan....plugging away on it. It's my mindless project. Definitley being a glutton for punishment with all the blocks to sew on. By the way it's 6 1/2 feet wide and it will be 8 feet long.
Sweater...we won't go there.
International Tote Exchange ... yarn and pattern picked, will be casting on this week.
International Scarf Exchange... will be going in the mail by friday.
SP 10... final package will be getting mailed by friday also.
Afghan....plugging away on it. It's my mindless project. Definitley being a glutton for punishment with all the blocks to sew on. By the way it's 6 1/2 feet wide and it will be 8 feet long.
Sweater...we won't go there.
International Tote Exchange ... yarn and pattern picked, will be casting on this week.
International Scarf Exchange... will be going in the mail by friday.
SP 10... final package will be getting mailed by friday also.
Monday, May 21, 2007
Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Monday, May 14, 2007
Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE>
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
9.) Gifted Mittens -- DONE
Tuesday, May 08, 2007
Stashalong Update
Green = Sitting there feeling neglected (1 Project).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.)A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.)A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.)A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.)Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.)Gifted Mittens -- DONE
10.)ISE 4 scarf (Lopi) -- DONE
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.)
4.)
5.)
6.)
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.)
10.)
Monday, April 30, 2007
Halfway on Counts list. Inventory count Met!!!
Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Sunday, April 29, 2007
ISE 4 Scarf Completely Several Photos
I finished and blocked the scarf I've been working on for my downstream ISE 4 pal today. Below are photos of the finished scarf whole blocking and then afterwards. So this scarf will be making it's way to it's recipient over the next couple weeks with a couple little gifts in it. I will post yarn and pattern information after my scarf pal gets the scarf.
You'll notice that it took 2 surfaces to block. In my little corner of the world, you use whatever you have at hand. For the method I used to block I didn't want to chance ruining the carpet so it meant taking up the kitchen and use the kitchen table and ironing board. Plus guard it from Cliona.
Scarf while blocking (please pardon the ugly litterbox and messy bakers rack).

Post blocking, sitting on the ironing board.

Close-up detail of the cables

You'll notice that it took 2 surfaces to block. In my little corner of the world, you use whatever you have at hand. For the method I used to block I didn't want to chance ruining the carpet so it meant taking up the kitchen and use the kitchen table and ironing board. Plus guard it from Cliona.
Scarf while blocking (please pardon the ugly litterbox and messy bakers rack).
Post blocking, sitting on the ironing board.
Close-up detail of the cables
Saturday, April 28, 2007
Got A Lot Done This Week
In both the knitting and non-knitting worlds of my life. In the knitting world of my life I was able to:
1.) Get going again on my Irish Hiking Scarf. It's been sitting there on the needles for about 5 months. I've had other projects that were demanding my time with deadlines that were more pressing. Ok it was originally going to be a Christmas present last year for my Dad, but when I realized it wasn't going to be done in time for Christmas last year or his birthday this year, I decided to make it one of his Christmas presents this year. I'd have more than enough time then. Now with the other projects out of the way, I have time for it now.
2.) I've nearly finished the scarf for my ISE 4 pal. It will actually be done by tomorrow night. Blocking and all. That will give me plenty of fime to get it ready to go out.
3.) I got a couple more rounds done on my lovely socks. Oh, what an adventure they were today. I went to work on them, went the twong way for half a round, had to undo that bit and get them onto smaller needles. Then back onto the correct needles for fear I was going to break the bamboo needles they were on for those weren't my needles. BY the time i got that accomplished I should have known to take a breather. I didn't though. By the time I got going it was 45 minutes later. What took me 45 minutes? I couldn't figure out what direction to go in and which needles to use. Ok if you go in 1 direction and that's the wrong way then you need to go the other way right?! But the 2 tips of 2 circs had me stumped for some reason till I remembered I had my book with me to help me out. Definitley needed more caffiene to wake up. At least I provided humor for the others in my SnB group.
4.) Did some destashing.
In the Non-Knitting world of my life:
1.) Got back in touch with another family member
2.) Had my usual group and appointement
3.) Attended the monthly Community Advisory Board meeting
4.) Ran the Advocacy Committee Meeting (I chair the committee) that meets every other month.
5.) Attended the AdHoc committee where we chose award recipients (if you know me no I will not tell you who's getting the awards. I'm not allowed to till the Annual Dinner next month)
6.) Some heavy duty spring cleaning and rearranging.
7.) Spun and set the twist of about 37 yards of wool.
1.) Get going again on my Irish Hiking Scarf. It's been sitting there on the needles for about 5 months. I've had other projects that were demanding my time with deadlines that were more pressing. Ok it was originally going to be a Christmas present last year for my Dad, but when I realized it wasn't going to be done in time for Christmas last year or his birthday this year, I decided to make it one of his Christmas presents this year. I'd have more than enough time then. Now with the other projects out of the way, I have time for it now.
2.) I've nearly finished the scarf for my ISE 4 pal. It will actually be done by tomorrow night. Blocking and all. That will give me plenty of fime to get it ready to go out.
3.) I got a couple more rounds done on my lovely socks. Oh, what an adventure they were today. I went to work on them, went the twong way for half a round, had to undo that bit and get them onto smaller needles. Then back onto the correct needles for fear I was going to break the bamboo needles they were on for those weren't my needles. BY the time i got that accomplished I should have known to take a breather. I didn't though. By the time I got going it was 45 minutes later. What took me 45 minutes? I couldn't figure out what direction to go in and which needles to use. Ok if you go in 1 direction and that's the wrong way then you need to go the other way right?! But the 2 tips of 2 circs had me stumped for some reason till I remembered I had my book with me to help me out. Definitley needed more caffiene to wake up. At least I provided humor for the others in my SnB group.
4.) Did some destashing.
In the Non-Knitting world of my life:
1.) Got back in touch with another family member
2.) Had my usual group and appointement
3.) Attended the monthly Community Advisory Board meeting
4.) Ran the Advocacy Committee Meeting (I chair the committee) that meets every other month.
5.) Attended the AdHoc committee where we chose award recipients (if you know me no I will not tell you who's getting the awards. I'm not allowed to till the Annual Dinner next month)
6.) Some heavy duty spring cleaning and rearranging.
7.) Spun and set the twist of about 37 yards of wool.
Labels:
Aran,
Cable,
Destash,
Drop Spindle,
Family,
Friends,
Handspinning,
ISE 4,
Non-Knitting,
Roving,
Scarf,
X-Mas
Friday, April 27, 2007
Stashalong Udate
Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.
The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.
The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.
Wednesday, April 25, 2007
ALmost done
less than 2 feet to go and my ISE pal's scarf will be done. THen to block it. That's always fun here. My cat doesn't like getting locked out of rooms, but it must be done overnight while things block. Hope my pal likes it.
Friday, March 23, 2007
SP10 & ISE 4
Secret Pal 10
Contact with SP Spoiler ... has been made.
Contact with SP Spoilee ... had been made.
Package for SP Spoilee .... in progress of being put together.
ISE 4
Contact with the person I'm knitting for ... has been made.
Contact with the person knitting for me ... has been made.
Pattern for the scarf I'm making ... narrowed down to a couple.
Yarn for scarf I'm making ... purchased.
Contact with SP Spoiler ... has been made.
Contact with SP Spoilee ... had been made.
Package for SP Spoilee .... in progress of being put together.
ISE 4
Contact with the person I'm knitting for ... has been made.
Contact with the person knitting for me ... has been made.
Pattern for the scarf I'm making ... narrowed down to a couple.
Yarn for scarf I'm making ... purchased.
Subscribe to:
Posts (Atom)