Yellow = I'm plugging away on it. (2 projects).
Red = Done (8 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Yet again stalled.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost done, on to the cuffs.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE and sent off
Showing posts with label Baby. Show all posts
Showing posts with label Baby. Show all posts
Friday, June 08, 2007
Monday, May 21, 2007
Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Monday, May 14, 2007
Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE>
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
9.) Gifted Mittens -- DONE
Tuesday, May 08, 2007
Stashalong Update
Green = Sitting there feeling neglected (1 Project).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.)A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.)A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.)A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.)Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.)Gifted Mittens -- DONE
10.)ISE 4 scarf (Lopi) -- DONE
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.)
4.)
5.)
6.)
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.)
10.)
Monday, April 30, 2007
Halfway on Counts list. Inventory count Met!!!
Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Friday, April 27, 2007
Stashalong Udate
Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.
The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.
The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.
Monday, April 16, 2007
Life Sucks
The baby blanket I worked so hard on and finished last weekend. Well it was for a my cousin and his wife. Their baby was due today (Sunday). Well, yesterday when I talked to my parents they had news about the baby for me.
The baby died. As if that's not bad enough, the baby died before it was born. One day the baby's perfectly fine. Not 24 hours later, the baby is dead. Can life get any worse.
The baby died. As if that's not bad enough, the baby died before it was born. One day the baby's perfectly fine. Not 24 hours later, the baby is dead. Can life get any worse.
Thursday, February 22, 2007
Busy week
I've been knitting like mad here. I've gotten 1/4 the way through a hooded baby bath blanket. I need to make 2 of them. My index finget is sore from the knitting needle tip. Now tonight I was asked to make 2 cup cozies for next Thursday. Of course a non-knitter had to ask me with that little time and all the stuff I have to get done. This link shows everything that has to be done by Wednesday night preferably. That way if anything goes wrong my friends and I will have the next morning to figure out a solution. The fair starts at noon.
Thursday, February 15, 2007
Joined Stashalong
I've Joined Stashalong. Right now I'll be doing option 3. That is until I get to sit down and inventory my yarn onto the computer. Then I'll (if it's allowed) add in option 2. My projects are:
An Irish Aran Sweater (using Patons Classic Merino)
Knitty's Chaos note: need to finish it really soon baby is due on 4/15 (using some red heart baby yarn for body and another for the arms)
A scarf and hat set for a raffle on March 1 (yarns unknown)
A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart)
A cotton hooded bath blanket for the baby to be (using lilly sugar and cream)
A second hooded bath blanket for another baby to be (using unknown cotton yarn in stash)
Triangle Shawl for Mom (Yarn not picked yet)
Afghan for Dad (Yarn not picked yet)
"Screaming Stash"
"Screaming Stash"
So that's my project list for Option 3
An Irish Aran Sweater (using Patons Classic Merino)
Knitty's Chaos note: need to finish it really soon baby is due on 4/15 (using some red heart baby yarn for body and another for the arms)
A scarf and hat set for a raffle on March 1 (yarns unknown)
A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart)
A cotton hooded bath blanket for the baby to be (using lilly sugar and cream)
A second hooded bath blanket for another baby to be (using unknown cotton yarn in stash)
Triangle Shawl for Mom (Yarn not picked yet)
Afghan for Dad (Yarn not picked yet)
"Screaming Stash"
"Screaming Stash"
So that's my project list for Option 3
Sunday, October 22, 2006
4.5 Days Away Translates into…
er… 4.5 days of knitting. Yep that’s what it meant here. I just back this afternoon. Was house and dog sitting while I was away. My days basically consisted of knitting, taking the dog out, knitting, vegging out, going to knitting group with my aunt Saturday morning, talking on the phone, and relaxing. While I was gone I was able to get my aunt’s scarf done, baby booties made, the back of a baby sweater (Knitty’s Chaos) made all the way to the arm shaping, a pair of slippers, and working on my IHS. Pics are below.
Left to right, the project pictures are: Baby booties from SNB Nation; Slippers; Chaos from Knitty.com; Irish Hiking Scarf; Drop stitch scarf; My parent's dog modeling the previously mentioned scarf. This is all knitting I did over 4.5 days. Exception is that I started the hiking scarf during the week, but only had 2 or 3 twists in it.




Subscribe to:
Posts (Atom)