Showing posts with label Destash. Show all posts
Showing posts with label Destash. Show all posts

Friday, June 08, 2007

Weekly Stashalong Update

Yellow = I'm plugging away on it. (2 projects).
Red = Done (8 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Yet again stalled.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost done, on to the cuffs.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE and sent off

Monday, May 21, 2007

Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE

4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Monday, May 14, 2007

Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE>
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Tuesday, May 08, 2007

Stashalong Update

Green = Sitting there feeling neglected (1 Project).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Monday, April 30, 2007

Halfway on Counts list. Inventory count Met!!!

Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Saturday, April 28, 2007

Got A Lot Done This Week

In both the knitting and non-knitting worlds of my life. In the knitting world of my life I was able to:
1.) Get going again on my Irish Hiking Scarf. It's been sitting there on the needles for about 5 months. I've had other projects that were demanding my time with deadlines that were more pressing. Ok it was originally going to be a Christmas present last year for my Dad, but when I realized it wasn't going to be done in time for Christmas last year or his birthday this year, I decided to make it one of his Christmas presents this year. I'd have more than enough time then. Now with the other projects out of the way, I have time for it now.

2.) I've nearly finished the scarf for my ISE 4 pal. It will actually be done by tomorrow night. Blocking and all. That will give me plenty of fime to get it ready to go out.

3.) I got a couple more rounds done on my lovely socks. Oh, what an adventure they were today. I went to work on them, went the twong way for half a round, had to undo that bit and get them onto smaller needles. Then back onto the correct needles for fear I was going to break the bamboo needles they were on for those weren't my needles. BY the time i got that accomplished I should have known to take a breather. I didn't though. By the time I got going it was 45 minutes later. What took me 45 minutes? I couldn't figure out what direction to go in and which needles to use. Ok if you go in 1 direction and that's the wrong way then you need to go the other way right?! But the 2 tips of 2 circs had me stumped for some reason till I remembered I had my book with me to help me out. Definitley needed more caffiene to wake up. At least I provided humor for the others in my SnB group.
4.) Did some destashing.

In the Non-Knitting world of my life:
1.) Got back in touch with another family member
2.) Had my usual group and appointement
3.) Attended the monthly Community Advisory Board meeting
4.) Ran the Advocacy Committee Meeting (I chair the committee) that meets every other month.
5.) Attended the AdHoc committee where we chose award recipients (if you know me no I will not tell you who's getting the awards. I'm not allowed to till the Annual Dinner next month)
6.) Some heavy duty spring cleaning and rearranging.
7.) Spun and set the twist of about 37 yards of wool.

Friday, April 27, 2007

Stashalong Udate

Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.

The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.

Monday, February 12, 2007

I have come to the conclusion I need to give some of my stash away, It's yarn that I will never use. Yarn that was made ages ago. It's acrylic that is really cruddy. I'll never use it in any of my projects. Also it doesn't feel nice. The price tags on some are from stores that no longer exist one I never even heard of but was popular here in this town. Also it sold for less than a dollar a skein at that time. The bands on the skeins don't even say anything about guage or needle sizes even. That's how old the yarn is. Maybe the senior enter will like it.

Sunday, March 07, 2004

Inventory

Brand, Line, Amount (Yards, Meters, Grams or Ounces), Color, Quantity
1.) Sockotta, 414yds, 362, 1
2.) Meilenweit, Mega boot stretch, 400m, 703, 1
3.) Lion Brand, Homespun, 185, Edwardian, 4
4.) Knit Picks, Gloss, 220, Burgundy, 1,
5.) Patons, Classic Wool, 223, Winter White, 8
6.) Boquet, Floss, 25g, 6060, 4
7.) Phildar, Pronostic, 175, Blanc, 1
8.) Geisha, 175m, Gray, 6
9.) Boquet, Chunky Spun, 50g, 8863, 3
10.) LeChat, 2oz, Plum, 5
11.) Lion Brand, Jiffy, 135, Navy, 1
12.) Schachenmayr, Arabesque, 50g, F111, 4
13.) Schachenmayr, Arabesque, 50g, F110, 4
14.) Red Heart, Super Saver, 364, Lavender, 1
15.) Red Heart, Super Saver, 364, Pale Yellow, 1
16.) Red Heart, Super Saver, 364, Royal, 2
17) Red Heart, Super Saver, 364, Frosty Green, 1
18.) Red Heart, Super Saver, 364, Light Raspberry, 1
19.) Red Heart, Super Saver, 364, Lt Blue, 2
20.) Knit Picks, Wool Of The Andes, 110, Chocolate, 1
21.) Knit Picks, Wool Of The Andes, 110, Chestnut, 1
22.) Berocco, Optik, 87, 4928, 1
23.) InterMezzo, Chunky, 124, 9, 4
24.) Lopi, Partial, Green, 1
25.) Grand Duchess, 46m, 2057, 2
26.) Kogiu, KPPPM, 1
27.) Phildar, Phildouce 3 1/2, 40g, 42b, 1
28.) Phildar, Whisper 287, 50g, 73, 3
29.) Lion Brand, Magic Stripes, 1
30.) Red Heart, Super Saver, Partial, Green, 1
31.) Red Heart, Super Saver, Partial, White, 1
32.) Red Heart, Super Saver, Partial, Med Blue, 1
33.) Red Heart, Super Saver, Partial, Green, 1
34.) Handspun, Llama, unk, brn & white, 1
35.) Handspun, unk, unk, brn, 1
36.) laceweight, unk, blue, 2
37.) unk, multi, 1
38.) unk, aran, 4
39.) unk, ppl, 2
40.) laceweight, unk, peach, 1
41.) laceweight, unk, lt blue, 1