Showing posts with label Cotton. Show all posts
Showing posts with label Cotton. Show all posts

Monday, September 10, 2007

Back and Forth I Go

It's been one hectic month in my non-knitting life. Hence it being so long since an update.

I've been on a dishcloth spree. Off the top of my head I can remember making 5 and 2 more in progress. I'm planning on making a bunch more for Christmas gifts. They'll also have Tribbles with them too.

I'm working on the afghan. Dad has decided he doesn't want it 8' long anymore. It's long enough where it is he said! YAY! thing is now i have to even the working edge off and fill in a few holes. THat's ok. I can deal with that. It also frees me up to start on other Christmas gifts. Eventually I'll get back to my sweater. Pics coming by the end of the week of afghan and dishcloths.

Wednesday, August 15, 2007

Tibbles & Dishcloths

I've crossed over to the other side. In other words, I've started making Tribbles. I'll tell you it's so much fun. Watch out though. It's addictive. They multiply so fast too. I'm also on a dishcloth spree too. Good thing they're intended for christmas gifts. The tribbles too. THat is the ones that I don't decide to keep or send to the shop.

While I was making them I realized that they would be really handy down at my landlady's store. She's the one with the paint your own pottery and stained glass studio. In order to keep the pottery molds from pitting and/or getting a fuzz on them between pourings if they aren't going to be used right away, the excess clay has to be cleaned off the mold. I realized that the Tribbles would be good for just this purpose. They'd also be good for getting glaze off the wall (don't ask). I gave her one today and I'm going to have a couple more on back up.

The afghan is 4' from being done. Everything else has gone into a temporary hibernation. I just need a little break from them.

Monday, August 13, 2007

He he he

Cliona's a typical cat I guess. She usually leaves yarn alone. She did this in just a few minutes though. Had to share it though. Man, you gotta love that little furball, don't you.

I had to cut the yarn off of her and her leg. She had it wrapped around one of her legs rather tight. Sheesh.

Saturday, August 04, 2007

FInally Learned Entrelac!!!!

Yay!!! I have finally figured out entrelac! I'm so happy I don't want to put my dishcloth down. I've fianlly figured it out by starting and working on the Garterlac Dishcloth. I'll Definitley Post pics when it's done.

Thursday, June 21, 2007

My SP Is The Best

I got my reveal package yesterday. If I wasn't so tired I would have posted about it yesterday. It's been a busy week and I am very sorry that I didn't post. My pal (Amy) sent me A knit cotton Discloth with a 4 leaf clover knit into it, 2 skiens of Yarn Treehouse Lace weight Merino Yarn (So soft and pretty), Treats and toys for Cliona (Many purrs from Cliona I must add), CHOCOLATE (Cadburys Irish Cream filled bar), A Knitting with fabric Kit (can't wait to get to it), An Irish Angel pin, A Yankee Candle Car Jar (Lavender), an Angel ornament, And A Stitch Counter Bracelet (with celtic knot beads). Amy You are the best!!!


Posted by Picasa

Friday, June 08, 2007

Weekly Stashalong Update

Yellow = I'm plugging away on it. (2 projects).
Red = Done (8 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Yet again stalled.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost done, on to the cuffs.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE and sent off

Monday, May 21, 2007

Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE

4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Monday, May 14, 2007

Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE>
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Tuesday, May 08, 2007

Stashalong Update

Green = Sitting there feeling neglected (1 Project).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Monday, April 30, 2007

Halfway on Counts list. Inventory count Met!!!

Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Friday, April 27, 2007

Stashalong Udate

Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.

The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.

Monday, April 16, 2007

Life Sucks

The baby blanket I worked so hard on and finished last weekend. Well it was for a my cousin and his wife. Their baby was due today (Sunday). Well, yesterday when I talked to my parents they had news about the baby for me.

The baby died. As if that's not bad enough, the baby died before it was born. One day the baby's perfectly fine. Not 24 hours later, the baby is dead. Can life get any worse.

Monday, January 30, 2006

Dishcloths

So I have gotten back on track with my knitting. I've gotten the dishcloth bug. So far I've done 2 in as many days. I'm using the Lily Sugar'N'Cream yarn. It's 100% cotton. I've gotten 2 out of the regular sized skein and still had a little left over. The Twilight is a fun color to work with. I also have Natural Ombre and have yet to use that. I need to find another pattern. Still working on finding the pattern that I like best. Can't wait to get one of the 1lb. cones. These are making up so easily I may just see if my friend that's doing a fundraiser wants some for it. I'll post pics as soon as i get them on the comp.