Friday, June 08, 2007
Weekly Stashalong Update
Red = Done (8 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Yet again stalled.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost done, on to the cuffs.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE and sent off
Monday, May 21, 2007
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Monday, May 14, 2007
1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
9.) Gifted Mittens -- DONE
Tuesday, May 08, 2007
Stashalong Update
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.)
4.)
5.)
6.)
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.)
10.)
Monday, April 30, 2007
Halfway on Counts list. Inventory count Met!!!
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE
Friday, April 27, 2007
Stashalong Udate
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.
The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.
Friday, April 20, 2007
Stashalong Update
Green = Sitting there feeling neglected (3 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (5 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. I'm doing them on 2 circulars from the toe up at the same time.
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- On hold until other more pressing projects get done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- casted on about 4 feet in. A lot of progress was made on it this week.
The yarn count is up to 107 after the yarn that was given to me.
Tuesday, April 10, 2007
Knitting Away
Green = Sitting there feeling neglected (3 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (5 projects).
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. I'm doing them on 2 circulars from the toe up at the same time.
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- Still working on it.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- On hold until other more pressing projects get done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- casted on about 8 inches in.
The yarn count is up to 107 after the yarn that was given to me..
Wednesday, April 04, 2007
1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there calling to me
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Just finished the toes. I'm doing them on 2 circulars from the toe up at the same time.
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- Still working on it.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- On hold until other more pressing projects get done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (will be using the Lopi I bought last week) -- casted on about 6 inches in.
Now to get the skien count down. It went up yesterday as a staff member gave me 2 garbage bags full of yarn. I'm not keeping all of it. Some of it I can't help but keep as it is really nice and some of it is MOHAIR!!! Yes someone gave Mohair away. Over here in my world that's insanity and for the recipient a gift that you don't pass up. You keep the Mohair. It's around 20 skiens of Mohair. Skien count before addindg in the yarn given to me: 80. I will be thinning out again.
Friday, March 23, 2007
SP10 & ISE 4
Contact with SP Spoiler ... has been made.
Contact with SP Spoilee ... had been made.
Package for SP Spoilee .... in progress of being put together.
ISE 4
Contact with the person I'm knitting for ... has been made.
Contact with the person knitting for me ... has been made.
Pattern for the scarf I'm making ... narrowed down to a couple.
Yarn for scarf I'm making ... purchased.
Monday, December 11, 2006
IMMEDIATE FAMILY (referred to as Family)
Dad --- Cable Scarf
Mom --- Branching Out (Scarf on Knitty)Ruffle Hat
Aunt Shelly --- Embrace (Scarf on Knitty)Ruffle Hat
Uncle Herbie --- Scarf & Hat (both of my own design)
Aunt Bo --- Scarf (drop stitch)Ruffle Hat
Pam, Jon, Mandy, JR, Julie, Nicky, Carlie, Ally, Kirsten, Madison, Sydney, Sammy, Jonny
Wednesday, December 06, 2006
Holiday Knitting
Below is mylist of christmas knitting that is to be done as it stands now. Red = Done, Wrapped, & Tagged.
IMMEDIATE FAMILY
Dad --- Cable Scarf
Mom --- Branching Out (Scarf on Knitty)
Ruffle Hat
Aunt Shelly --- Embrace (Scarf on Knitty)Ruffle Hat
Uncle Herbie --- Scarf & Hat (both of my own design)
Aunt Bo --- Scarf (drop stitch)Ruffle Hat
ADOPTED AS FAMILY ( Completely Subject to change or if time doesn't allow, elimination)
Pam --- Slipper Socks
Jon
Mandy --- Drop Stitch Scarf (purple)
JR --- who know what yet, but in orange
Julie --- Slipper Socks
Nicky --- Scarf
Carlie --- Scarf
Ally --- Scarf
Kirsten --- Scarf
Bubby --- Scarf
Jonny --- Felted Paint Brush Holder
Sydney --- Slipper Socks
Sammy --- Fingerless Gloves
OTHER FRIENDS
Don
Robbyn --- Slipper Socks
Diane --- Slipper Socks
Tuesday, November 14, 2006
knitting X-mas List Updated
IMMEDIATE FAMILY
Dad --- Irish Hiking Scarf
Mom --- Branching Out (Scarf on Knitty)
Ruffle Hat
Aunt Shelly --- Embrace (Scarf on Knitty)
Ruffle Hat
Uncle Herbie --- Scarf & Hat (both of my own design)
Aunt Bo --- Scarf (drop stitch)
Ruffle Hat
ADOPTED AS FAMILY ( Completely Subject to change or if time doesn't allow, elimination)
Pam --- Slipper Socks
Jon
Mandy --- Slipper Socks (purple)
JR --- who know what yet, but in orange
Julie --- Slipper Socks
Nicky
Carlie
Ally
Kirsten
Madison
Jonny --- Felted Paint Brush Holder
Sydney --- Slipper Socks
Sammy --- FIngerless Gloves
OTHER FRIENDS
Don
Robbyn --- Slipper Socks
Diane --- Slipper Socks