Showing posts with label Update. Show all posts
Showing posts with label Update. Show all posts

Friday, June 08, 2007

Weekly Stashalong Update

Yellow = I'm plugging away on it. (2 projects).
Red = Done (8 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Yet again stalled.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost done, on to the cuffs.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE and sent off

Monday, May 21, 2007

Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Halfway through gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE

4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Working on. The knitting version of a crazy quilt. I've determined the width. I'd say About 15% done.
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Monday, May 14, 2007

Yellow = I'm plugging away on it. (3 projects).
Red = Done (7 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Trying to do a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Started to gussets.
3.) A scarf and hat set for a raffle on March 1 -- DONE
4.) A scarf for same raffle on March 1 -- DONE.
5.) A cotton hooded bath blanket for the baby to be -- DONE
6.) Shawl for my Mom -- DONE>
7.) Afghan for Dad (Yarn will be a mix) -- Working on again. Being done in random sized blocks
8.) Irish Hiking Scarf -- DONE
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Tuesday, May 08, 2007

Stashalong Update

Green = Sitting there feeling neglected (1 Project).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (6 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Doing a minimum of 2 rows a night.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Almost to the gusset increases, about 20 rows away.
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- 32 repeats in, about 12 to go before reaching the hoped for length
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Monday, April 30, 2007

Halfway on Counts list. Inventory count Met!!!

Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (6 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Still there
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- You would have had a good laugh Saturday
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Stalled
8.) Irish Hiking Scarf -- On a roll with it. Even remembered the pattern without any help after several months
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- DONE

Friday, April 27, 2007

Stashalong Udate

Green = Sitting there feeling neglected (2 Projects).
Yellow = I'm plugging away on it. (3 projects).
Red = Done (5 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. Only got to do 1 row this week
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- Working on it again got a pattern repear or 2 done this week.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- less than a foot to go. To be finished this weekend.

The yarn count is down to 81 after going through it and pulling out a bit to give to my 10 year old "niece" (daughter of a family friend that looks to me as an aunt) who will be learning to use the Knifty Knitter, and donating other yarn.

Friday, April 20, 2007

Stashalong Update

Green = Sitting there feeling neglected (3 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (5 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. I'm doing them on 2 circulars from the toe up at the same time.
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- DONE the family won't get to use the blanket for the baby as the baby died 3 days before the due date.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- On hold until other more pressing projects get done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- casted on about 4 feet in. A lot of progress was made on it this week.

The yarn count is up to 107 after the yarn that was given to me.

Tuesday, April 10, 2007

Knitting Away

One more project down (number 5).

Green = Sitting there feeling neglected (3 Projects).
Yellow = I'm plugging away on it. (2 projects).
Red = Done (5 projects).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there feeling neglected. Must pay attention to it soon.
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Toes done...somewhere on the foot. I'm doing them on 2 circulars from the toe up at the same time.
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- Still working on it.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- On hold until other more pressing projects get done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (Lopi) -- casted on about 8 inches in.

The yarn count is up to 107 after the yarn that was given to me..

Wednesday, April 04, 2007

The Stashalong is going well. One project got done this week (number 6). I'm plugging away on 3 projects (ones in Yellow).

1.) Irish Aran Sweater (using Patons Classic Merino) -- Sitting there calling to me
2.) My First Pair of Socks (Regia 6 ply Crazy Color ) -- Just finished the toes. I'm doing them on 2 circulars from the toe up at the same time.
3.) A scarf and hat set for a raffle on March 1 (yarns unknown) -- DONE
4.) A scarf for same raffle on March 1 (using 1 partially used ball wool yarn and 1 partially used skien red heart) -- DONE.
5.) A cotton hooded bath blanket for the baby to be (using lilly sugar and cream) -- Still working on it.
6.) Shawl for my Mom (Homespun) -- DONE
7.) Afghan for Dad (Yarn will be a mix) -- Slowly working on. It's my mindless project.
8.) Irish Hiking Scarf -- On hold until other more pressing projects get done.
9.) Gifted Mittens -- DONE
10.) ISE 4 scarf (will be using the Lopi I bought last week) -- casted on about 6 inches in.

Now to get the skien count down. It went up yesterday as a staff member gave me 2 garbage bags full of yarn. I'm not keeping all of it. Some of it I can't help but keep as it is really nice and some of it is MOHAIR!!! Yes someone gave Mohair away. Over here in my world that's insanity and for the recipient a gift that you don't pass up. You keep the Mohair. It's around 20 skiens of Mohair. Skien count before addindg in the yarn given to me: 80. I will be thinning out again.

Friday, March 23, 2007

SP10 & ISE 4

Secret Pal 10
Contact with SP Spoiler ... has been made.
Contact with SP Spoilee ... had been made.
Package for SP Spoilee .... in progress of being put together.

ISE 4
Contact with the person I'm knitting for ... has been made.
Contact with the person knitting for me ... has been made.
Pattern for the scarf I'm making ... narrowed down to a couple.
Yarn for scarf I'm making ... purchased.

Monday, December 11, 2006

I have come to face the truth. I will succeed in knitting all of my family's gifts, but my "family's" gifts are going to be a no-go this year. I will have to start earlier next year. SO the list of knitting is:

IMMEDIATE FAMILY (referred to as Family)
Dad --- Cable Scarf
Mom --- Branching Out (Scarf on Knitty)Ruffle Hat
Aunt Shelly --- Embrace (Scarf on Knitty)Ruffle Hat
Uncle Herbie --- Scarf & Hat (both of my own design)
Aunt Bo --- Scarf (drop stitch)Ruffle Hat
OTHER FRIENDS
Don (not going to have time for)
Robbyn --- Slipper Socks
Diane --- Slipper Socks
ADOPTED AS FAMILY (referred to as "Family")( I'm unfortunately not going to have time to make items for anyone on this list. thankfully they understand).
Pam, Jon, Mandy, JR, Julie, Nicky, Carlie, Ally, Kirsten, Madison, Sydney, Sammy, Jonny

Wednesday, December 06, 2006

Holiday Knitting

It seems like I just can't get ahead this year in the christmas knitting this year. As soon as I get one person off the list, another person replaces the project that just got crossed off. I'm starting to stress and can see some late nights coming up.

Below is mylist of christmas knitting that is to be done as it stands now. Red = Done, Wrapped, & Tagged.
IMMEDIATE FAMILY
Dad --- Cable Scarf
Mom --- Branching Out (Scarf on Knitty)
Ruffle Hat
Aunt Shelly --- Embrace (Scarf on Knitty)Ruffle Hat
Uncle Herbie --- Scarf & Hat (both of my own design)
Aunt Bo --- Scarf (drop stitch)Ruffle Hat
ADOPTED AS FAMILY ( Completely Subject to change or if time doesn't allow, elimination)
Pam --- Slipper Socks
Jon
Mandy --- Drop Stitch Scarf (purple)
JR --- who know what yet, but in orange
Julie --- Slipper Socks
Nicky --- Scarf
Carlie --- Scarf
Ally --- Scarf
Kirsten --- Scarf
Bubby --- Scarf
Jonny --- Felted Paint Brush Holder
Sydney --- Slipper Socks
Sammy --- Fingerless Gloves
OTHER FRIENDS
Don
Robbyn --- Slipper Socks
Diane --- Slipper Socks

Tuesday, November 14, 2006

knitting X-mas List Updated

Below is mylist of christmas knitting that is to be done as it stands now. Red = Done & Ready To wrap

IMMEDIATE FAMILY
Dad --- Irish Hiking Scarf
Mom --- Branching Out (Scarf on Knitty)
Ruffle Hat
Aunt Shelly --- Embrace (Scarf on Knitty)
Ruffle Hat
Uncle Herbie --- Scarf & Hat (both of my own design)
Aunt Bo --- Scarf (drop stitch)
Ruffle Hat


ADOPTED AS FAMILY ( Completely Subject to change or if time doesn't allow, elimination)
Pam --- Slipper Socks
Jon
Mandy --- Slipper Socks (purple)
JR --- who know what yet, but in orange
Julie --- Slipper Socks
Nicky
Carlie
Ally
Kirsten
Madison
Jonny --- Felted Paint Brush Holder
Sydney --- Slipper Socks
Sammy --- FIngerless Gloves

OTHER FRIENDS
Don
Robbyn --- Slipper Socks
Diane --- Slipper Socks